富水粉细砂层盾构接收端头补充注浆加固技术研究及实践

孙思施 李乔斌 钟久安 臧鹏

钻探工程2024,Vol.51Issue(5):163-168,6.
钻探工程2024,Vol.51Issue(5):163-168,6.DOI:10.12143/j.ztgc.2024.05.020

富水粉细砂层盾构接收端头补充注浆加固技术研究及实践

Research and practice of grouting reinforcement technology for the receiving end of shield tunneling in water-rich fine sand layers

孙思施 1李乔斌 2钟久安 2臧鹏2

作者信息

  • 1. 湖北水总水利水电建设股份有限公司,湖北 武汉 430056
  • 2. 四川共拓岩土科技股份有限公司,四川 成都 610073
  • 折叠

摘要

Abstract

The strata where the receiving end of air shaft shield is located in a subway section of the North China Plain is mainly silty clay,clayey silt and silty fine sand from top to bottom,with high underground water level and strong liquidity.After being reinforced by high-pressure rotary jet grouting at the receiving end,it was found that there is still a risk of water and sand inrush using horizontal exploration holes.The water and sand surging is easy to happen in the gap between the tunnel doors when the cutterhead of the shield tunneling machine break through the tunnel door.To ensure the shield machine smoothly passing out of the tunnel,the method of surface sleeve valve pipe grouting is adopted,and the GX modified silicon grouting material is used to consolidate the fine sand.Targeted reinforcement grouting is carried out in the receiving end of the interval air shaft within the water-rich fine sand formation.After treatment by such technology,the shield machine successfully excavated without any water or sand inrush.

关键词

地铁盾构/接收端头/袖阀管注浆/GX改性硅灌浆料/补强加固/富水粉细砂层

Key words

subway shield tunneling/receiving end/sleeve valve pipe grouting/GX modified silicon grouting material/reinforcement/water-rich silty fine sand layer

分类

交通工程

引用本文复制引用

孙思施,李乔斌,钟久安,臧鹏..富水粉细砂层盾构接收端头补充注浆加固技术研究及实践[J].钻探工程,2024,51(5):163-168,6.

基金项目

四川省科技计划产业示范项目"地下工程水害综合治理技术服务示范项目"(编号:2021GFW074) (编号:2021GFW074)

钻探工程

2096-9686

访问量0
|
下载量0
段落导航相关论文