源-荷-储多异质分布式资源参与配电网自我恢复方案与补偿机制OA北大核心CSTPCD
Self-recovery Scheme and Compensation Mechanism of Distribution Network With Source-load-storage Multi Heterogeneous Distributed Resources
为了应对新型电力系统潜在的大停电风险,从源-荷-储多环节挖掘分布式资源参与配电网恢复的潜力与价值,制定安全、快速的恢复方案成为必然需求.为此,考虑多时间尺度下的黑启动恢复过程对灵活性需求的不同,提出一种考虑多异质分布式资源参与的配电网自我恢复方案.首先,针对含有多类型分布式资源的配电系统,以最大化可用发电量和有功负荷恢复量为目标,构建分布式资源启动顺序优化模型.其次,基于节点重要度和路径恢复时间,构建综合路径评价指标,实现待启动机组的恢复路径优化,进而分时步投入停电负荷,以降低停电损失.第三,考虑恢复过程中的分布式资源黑启动能力与使用度,提出包含能力补偿费与使用补偿费的黑启动激励机制,有效促进服务费公平、合理分配.最后,以改进的IEEE33节点系统为例,通过对多个停电场景进行分析,结果表明所提方法可有效调配恢复资源,提升配电系统恢复的快速性与稳定性.
To cope with the blackout risk of the new power system,it is an inevitable requirement to explore the potential and value of distributed resources participating in distribution network recovery from the multiple links of source,load and storage,and work out a safe and fast recovery plan.For that reason,considering the different flexibility requirements of the black-start restoration process under multiple time scales,a self-restoration scheme of distribution network considering the par-ticipation of multiple heterogeneous distributed resources was proposed.Firstly,for the power distribution system with mul-tiple types of distributed resources,an optimization model of the start-up sequence of distributed resources was constructed with the goal of maximizing available power generation and active load recovery.Secondly,a comprehensive path evalu-ation was constructed based on node importance and path re-covery time to optimize the recovery path of the unit to be star-ted,and then the outage load was put into operation step by step to reduce the outage loss.Thirdly,considering the black-start capacity and utilization of distributed resources in the recovery process,a black-start incentive mechanism including capacity compensation fee and utilization compensation fee was pro-posed to effectively promote the fair and reasonable distribu-tion of service fees.Finally,taking the improved IEEE33 node system as an example,the analysis of multiple power outage scenarios shows that the proposed method can effectively alloc-ate restoration resources and improve the speed and stability of power distribution system restoration.
崔勇;徐耀杰;刘建行;涂崎;王伟红;顾军
国网上海市电力公司电力调度控制中心,上海市杨浦区 200122上海电力大学电气工程学院,上海市杨浦区 200090
动力与电气工程
配电网恢复分布式资源网架重构激励机制
distribution network restorationdistributed re-sourcesgrid reconfigurationincentive mechanism
《现代电力》 2024 (005)
866-877 / 12
国家电网有限公司科技项目(5209001200083) Science and Technology Project of State Grid Corporation of China(5209001200083)