水电站山区移民集中安置基础设施建设常见问题处治

王思华 郑云刚

云南水力发电2024,Vol.40Issue(9):6-10,23,6.
云南水力发电2024,Vol.40Issue(9):6-10,23,6.DOI:10.3969/j.issn.1006-3951.2024.09.002

水电站山区移民集中安置基础设施建设常见问题处治

Common Problems in Infrastructure Construction for Centralized Resettlement of Immigrants in Mountainous Areas of Hydropower Station

王思华 1郑云刚1

作者信息

  • 1. 中国电建集团昆明勘测设计研究院有限公司,云南 昆明 650051
  • 折叠

摘要

Abstract

The construction of supporting infrastructure for resettlement projects includes site leveling,access roads,water supply facilities,power supply facilities,school and public facility construction,etc.The centralized resettlement sites are affected by various factors,and the building sites that can meet the requirements of centralized resettlement are extremely limited.The selected construction site is constrained by terrain and topography,and in order to meet the safety and stability of infrastructure,corresponding treatment plans need to be taken for actual problems.Based on the common problems that arise during the implementation of specific engineering projects,this paper analyzes and summarizes the effectiveness of treatment plans.

关键词

集中安置/基础设施/移民意愿/处治方案

Key words

centralized resettlement/infrastructure/immigration willingness/treatment plan