云南水力发电2024,Vol.40Issue(9):47-51,5.DOI:10.3969/j.issn.1006-3951.2024.09.011
基于线性超长隧洞监测钻孔施工方法研究
Research on the Construction Method of Linear Ultra Long Tunnel Monitoring Drilling
张学良 1廖助强 1王丽娟 1薛维刚2
作者信息
- 1. 中国电建集团昆明勘测设计研究院有限公司,云南 昆明 650051
- 2. 云南省滇中引水工程有限公司,云南 昆明 650051
- 折叠
摘要
Abstract
In order to meet the high-efficiency operation requirements of monitoring personnel and drilling equipment in the linear ultra long water diversion tunnel project under frequent long-distance transitions and high-intensity cross operations,a long-distance tunnel monitoring drilling construction method based on vehicle mounted trolleys has been developed.Compared with the traditional method of setting up scaffolding,this method not only overcomes the high risks and costs caused by factors such as interference from the main construction and tight schedule in traditional monitoring construction,but also improves construction efficiency,reduces production costs,and ensures green construction while ensuring project quality.关键词
超长隧洞/车载台车/监测钻孔施工方法研究Key words
ultra long tunnel/vehicle mounted trolley/research on monitoring drilling construction method分类
建筑与水利引用本文复制引用
张学良,廖助强,王丽娟,薛维刚..基于线性超长隧洞监测钻孔施工方法研究[J].云南水力发电,2024,40(9):47-51,5.