云南水力发电2024,Vol.40Issue(9):61-63,3.DOI:10.3969/j.issn.1006-3951.2024.09.014
水泥基矽土(CIS)新型材料在隧洞堵水灌浆中的应用
Application of CIS New Material in Tunnel Water Blocking Grouting
张国良 1张采贤 1祁文强 1字明强1
作者信息
- 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
- 折叠
摘要
Abstract
Shigu Water Source Project of Central Yunnan Water Diversion Project is located on the left bank of Chongjiang River intake tunnel,in a water rich formation below the mountain's groundwater level,with abundant groundwater volume.The tunnel body passes through unfavorable geological sections such as fault fracture zones,karst fissures(caves),and karst pipelines.Groundwater flows out in the form of strands along the channels such as karst fissures and caves,eroding the filling materials in the channels and forming cavities,which have adverse effects on the stability of the tunnel body and pose safety hazards.The water influx inside the tunnel will also hinder the construction inside,affecting the construction progress and quality.During the tunnel construction process,it is necessary to determine water blocking schemes based on different water inflow situations to ensure construction safety and quality.CIS new material water blocking grouting construction scheme has been adopted,achieving significant results.关键词
富水地层/不良地质段/堵水灌浆/水泥基矽土(CIS)Key words
rich water formation/adverse geological section/water blocking grouting/CIS分类
建筑与水利引用本文复制引用
张国良,张采贤,祁文强,字明强..水泥基矽土(CIS)新型材料在隧洞堵水灌浆中的应用[J].云南水力发电,2024,40(9):61-63,3.