摘要
Abstract
The vertical shaft of Xianglushan Tunnel in Dali Section I of Central Yunnan Water Diversion Project is a newly added passage.The vertical shaft passes through dolomite limestone and andesite basalt from top to bottom,with prominent problems of karst water inrush and seepage,and high external water pressure.By using directional drilling to implement ground pre grouting for advanced water blocking and reinforcement of the vertical shaft,the safe and rapid excavation of the vertical shaft is ensured.The vertical shaft of Xianglushan Tunnel is constructed using 600m directional drilling.Currently,all drilling has been completed,and the inclination deviation is controlled within 3‰.The technology is feasible and the economic benefits are good.关键词
香炉山隧洞/竖井/600m/定向钻孔Key words
Xianglushan Tunnel/vertical shaft/600 m/directional drilling分类
建筑与水利引用本文复制引用
吴跃帮,张楚,徐峰,杨繁昌,龚贵秋..香炉山隧洞竖井600 m级定向钻钻孔施工技术[J].云南水力发电,2024,40(9):122-125,4.