| 注册
首页|期刊导航|云南水力发电|抱箍在盖梁施工中的应用

抱箍在盖梁施工中的应用

黎晓开

云南水力发电2024,Vol.40Issue(9):126-129,4.
云南水力发电2024,Vol.40Issue(9):126-129,4.DOI:10.3969/j.issn.1006-3951.2024.09.029

抱箍在盖梁施工中的应用

Application of Holt Hoops in Cover Beam Construction

黎晓开1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

The method of using cap beam holt hoops for construction is a non support cap beam construction technique.It bears the construction load of the cover beam through the friction between the hoop and the pier column,which is not affected by terrain,saves support,and is easy to construct.It also reduces construction costs,facilitates civilized construction on site,shortens the construction period,accelerates construction progress,and improves economic benefits.Taking the approach span cover beam of Zhanghe Bridge as an example,this paper elaborates on the construction technology,construction method,quality acceptance standards,and acceptance indicators of the hoop method cover beam,and verifies whether the hoop stress during the cover beam construction meets the construction requirements.

关键词

抱箍法/盖梁施工/受力计算

Key words

holt hoop iron method/cover beam construction/force calculation

分类

交通工程

引用本文复制引用

黎晓开..抱箍在盖梁施工中的应用[J].云南水力发电,2024,40(9):126-129,4.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文