缙蓄电站下库大坝填筑施工道路优化布置

董书礼

云南水力发电2024,Vol.40Issue(9):134-137,4.
云南水力发电2024,Vol.40Issue(9):134-137,4.DOI:10.3969/j.issn.1006-3951.2024.09.031

缙蓄电站下库大坝填筑施工道路优化布置

Optimization and Layout of Construction Roads for the Filling of Lower Reservoir Dam of Jinyun Pumped Storage Power Station

董书礼1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

During the construction process of dam filling in hydropower engineering,the layout of construction roads is an essential part of the preliminary construction preparation work,and many factors need to be considered.Based on the actual situation on site,this paper starts from the principles of safety,economy,and efficiency to carry out detailed planning of the construction road for the lower reservoir dam filling.Three planning schemes are formulated and compared to find the optimal dam filling road planning scheme,which effectively promotes the smooth construction of the project.

关键词

抽水蓄能/大坝填筑/道路布置/对比分析

Key words

pumped storage/dam filling/road layout/comparative analysis