基于QC小组活动的混凝土泵送堵管处理时间控制

王安肖 路飞 濮国轩 张春梅

云南水力发电2024,Vol.40Issue(9):201-204,4.
云南水力发电2024,Vol.40Issue(9):201-204,4.DOI:10.3969/j.issn.1006-3951.2024.09.047

基于QC小组活动的混凝土泵送堵管处理时间控制

Time Control of Concrete Pumping Blockage Treatment Based on QC Group Activities

王安肖 1路飞 1濮国轩 1张春梅1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

Based on the A3 project of Yizhao Expressway in Zhaotong City,Luozehe Extra Large Bridge is adopted QC group activities to carry out problem-solving group activities.By adopting a causal analysis diagram,the causes are analyzed from the aspects of human,machine,material,method,environment,and measurement,and targeted measures are proposed to address the factors that affect the treatment time of concrete pump blockage.It provides a guarantee for the continuity of the concrete of the Luoze River Grand Bridge,not only improving the construction quality of the concrete,but also ensuring the high-quality performance of the project.

关键词

洛泽河特大桥/QC小组/泵送堵管/处理时间/连续性

Key words

Luozehe Extra Large Bridge/QC group/pump blockage/processing time/continuity