云南水力发电2024,Vol.40Issue(9):209-212,4.DOI:10.3969/j.issn.1006-3951.2024.09.049
Solidworks建模在箱涵一期开挖中的应用
Application of Solidworks Modeling in the Excavation of Box Culvert Phase I
郭志方 1孙皇 1赵秋 1余恋涛1
作者信息
- 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
- 折叠
摘要
Abstract
The inlet box culvert of the Shigu Water Source Project in Yunnan Province intersects diagonally with the Chongjiang River,with a maximum excavation depth of 48 m.The first phase is the outlet section of the box culvert(on the right bank of the Chongjiang River).The excavation is divided into multiple levels of horse tracks,with the highest level being seven levels.High precision modeling is carried out using Solidworks as the main software,combined with FastTFT and AutoCAD auxiliary software,which can provide real-time understanding of the excavation situation of the on-site engineering quantity and provide technical support in the later stage.关键词
多级马道/Solidwork/FastTFT/AutoCAD/高精度建模/后期技术支持Key words
multi-level horse track/Solidwork/FastTFT/AutoCad/high precision modeling/post production technical support分类
建筑与水利引用本文复制引用
郭志方,孙皇,赵秋,余恋涛..Solidworks建模在箱涵一期开挖中的应用[J].云南水力发电,2024,40(9):209-212,4.