The inlet box culvert of the Shigu Water Source Project in Yunnan Province intersects diagonally with the Chongjiang River,with a maximum excavation depth of 48 m.The first phase is the outlet section of the box culvert(on the right bank of the Chongjiang River).The excavation is divided into multiple levels of horse tracks,with the highest level being seven levels.High precision modeling is carried out using Solidworks as the main software,combined with FastTFT and AutoCAD auxiliary software,which can provide real-time understanding of the excavation situation of the on-site engineering quantity and provide technical support in the later stage.

关键词

多级马道/Solidwork/FastTFT/AutoCAD/高精度建模/后期技术支持

Key words

multi-level horse track/Solidwork/FastTFT/AutoCad/high precision modeling/post production technical support