| 注册
首页|期刊导航|岩土工程学报|不等跨十车道四连拱隧道施工全过程支护结构受力特征现场测试研究

不等跨十车道四连拱隧道施工全过程支护结构受力特征现场测试研究

阳军生 汤冲 柏署 谢亦朋 李雨哲 杨磊

岩土工程学报2024,Vol.46Issue(10):2030-2040,11.
岩土工程学报2024,Vol.46Issue(10):2030-2040,11.DOI:10.11779/CJGE20230722

不等跨十车道四连拱隧道施工全过程支护结构受力特征现场测试研究

Field tests on stress characteristics of support structures of unequal-span ten-lane four-arch tunnel during whole construction process

阳军生 1汤冲 1柏署 2谢亦朋 1李雨哲 1杨磊3

作者信息

  • 1. 中南大学土木工程学院,湖南 长沙 410075
  • 2. 中南大学土木工程学院,湖南 长沙 410075||湖南省交通规划勘察设计院有限公司,湖南 长沙 410200
  • 3. 中铁二十五局集团有限公司,广东 广州 542814
  • 折叠

摘要

Abstract

The excavation of multi-arch tunnels with large chambers and spans leads to frequent load transfers and complex stress characteristics on the support structures,and the field tests allow for a more accurate study on the stress distribution characteristics of this kind of support structures.Based on the Guanyinyan unequal span four-arch tunnel project in Changsha,the strain gauges are used to monitor the stress characteristics in typical sections during the whole construction process of the steel arches and secondary linings.The test results reveal that the main advance tunnel experiences greater pressure of the surrounding rock compared with the subsequent tunnels.The excavation of the right main tunnel and the left and right auxiliary tunnels occurs later,resulting in fewer disturbances and smaller internal forces of the support structures.The overall distribution of internal forces of the steel arches is asymmetrical,with higher forces at the right side.The maximum axial pressure of 402.71 kN and the maximum bending moment of 7.97 kN·m are observed at the right foot of the left main tunnel.The secondary linings exhibit low asymmetry,only with the left main tunnel showing significant asymmetrical distribution.The internal force disturbances in the support structures of the left main tunnel are primarily influenced by the excavation of the subsequent adjacent tunnels.During the excavation and support stages of the subsequent right main tunnel and left auxiliary tunnel,most positions in the left main tunnel experiences the internal force increment exceeding half of the total increment.In summary,the construction plan of"first main and then auxiliary,left main first"is found to be reasonable,and the support structures meet the specification requirements.The research findings can provide references for the design and construction of multi-arch tunnels under complex conditions.

关键词

四连拱隧道/支护结构/现场测试/受力特征/安全性评价

Key words

four-arch tunnel/support structure/field test/stress characteristic/safety evaluation

分类

建筑与水利

引用本文复制引用

阳军生,汤冲,柏署,谢亦朋,李雨哲,杨磊..不等跨十车道四连拱隧道施工全过程支护结构受力特征现场测试研究[J].岩土工程学报,2024,46(10):2030-2040,11.

基金项目

湖南省交通运输厅科技项目(201915) (201915)

岩土工程学报

OA北大核心CSTPCD

1000-4548

访问量0
|
下载量0
段落导航相关论文