东北水利水电2024,Vol.42Issue(10):46-49,4.
辽宁大雅河抽水蓄能电站对大雅河水库影响分析
Influence analysis on Liaoning Dayahe Pumped Storage Power Station on Dayahe Reservoir
洪文彬 1周立洋 1王冠宇2
作者信息
- 1. 中水东北勘测设计研究有限责任公司,吉林长春 130021
- 2. 国网新源控股有限公司东北开发建设分公司,辽宁沈阳 110013
- 折叠
摘要
Abstract
This paper analyzes the reconstruction of Daya River Water Conservancy Project by taking the existing Daya River Reservoir as the lower reservoir of Liaoning Daya River Pumped Storage Power Station,in order to ensure its feasibility as the lower reservoir;The results show that the construction period has no impact on the existing functions of the Daya River Water Conservancy Project,and the annual power generation only decreases slightly during the normal operation period,which has no impact on land acquisition and migration.The results play a guiding role in the construction and operation management of the pumping and storage power station,and can provide reference for the development of similar projects.关键词
抽水蓄能电站/已建水库/工程改造/影响分析Key words
pumped storage power station/existing reservoir/engineering renovation/impact analysis分类
建筑与水利引用本文复制引用
洪文彬,周立洋,王冠宇..辽宁大雅河抽水蓄能电站对大雅河水库影响分析[J].东北水利水电,2024,42(10):46-49,4.