特高压输电线路工程PHC管桩基础造价研究

王子瑾 罗永磊 傅华风 杨光耀 张永飞

电力勘测设计Issue(9):23-27,45,6.
电力勘测设计Issue(9):23-27,45,6.DOI:10.13500/j.dlkcsj.issn1671-9913.2024.09.005

特高压输电线路工程PHC管桩基础造价研究

Research on the Cost of Pre-Stressed High-Strength Concrete Pile Foundation for UHV Transmission Line Project

王子瑾 1罗永磊 1傅华风 1杨光耀 1张永飞1

作者信息

  • 1. 中国电力工程顾问集团华东电力设计院有限公司,上海 200063
  • 折叠

摘要

Abstract

The application of pre-stressed high-strength concrete pile foundation has limitations,in recent years,UHV transmission line project has been constantly exploring and optimizing the differentiated application of pre-stressed high-strength concrete pile foundations.Although the application technology is relatively mature,there is still no in-depth research on the comparative analysis of comprehensive cost.This article takes a typical UHVDC transmission line project as an example to study the economic feasibility of adopting pre-stressed high-strength concrete pile foundation in practical engineering,which conducts research on pre-stressed high-strength concrete pile foundation by comparing them with the foundation scheme of cast-in-place piles,and combining with the charging and comprehensive cost of transmission lines.It is found that the cost of pre-stressed high-strength concrete pile foundation is about 23%to 33%higher than that of cast-in-place pile foundation,but other costs are lower than those of cast-in-place pile foundation.When the foundation force is small and the geological conditions are good,the comprehensive cost of pre-stressed high-strength concrete pile foundation has economic advantage.

关键词

特高压输电线路/预应力高强混凝土/管桩基础/综合造价

Key words

UHV transmission line/prestressed high-strength concrete/pile foundation/comprehensive cost