电力勘测设计Issue(9):28-32,58,6.DOI:10.13500/j.dlkcsj.issn1671-9913.2024.09.006
天然气发电总承包项目成本测算方法优化
Optimization of EPC Project Cost Estimation Method for Natural Gas-Fired Power Plant
王栋杰 1江越琪1
作者信息
- 1. 中国能源建设集团广东省电力设计研究院有限公司,广东 广州 510663
- 折叠
摘要
Abstract
This article aims at improving the accuracy and competitiveness of the bidding price,and reducing the execution risk for natural gas-fired power plants.By analyzing the currently used cost estimation methods and their deficiencies from the cost categorization and cost standards,and comparing the estimated and actual costs,the problems and deviations in the cost estimation process are analyzed.The optimized cost estimation method for engineering-procurement-construction(EPC)project of natural gas-fired power plant is proposed.The optimized cost estimation method can reflect the actual costs of natural gas-fired power generation projects more accurately.It is beneficial for improving execution efficiency and management level.关键词
天然气发电项目/总承包/成本测算Key words
natural gas-fired power plant/EPC/cost estimation分类
信息技术与安全科学引用本文复制引用
王栋杰,江越琪..天然气发电总承包项目成本测算方法优化[J].电力勘测设计,2024,(9):28-32,58,6.