摘要
Abstract
This article combines the planning example of a water supply system in a new district of Sichuan Province,analyzes the layout and various working conditions of the water supply network,obtains the water source pressure through adjustment,focuses on the selection method of fire points and accident points,and combines the pipe network layout to perform adjustment calculations for fire and accident conditions.The article suggests that we should make full use of the interactive relationship between pipe diameter and flow rate,and give full play to the advan-tages of computer trial calculations,in order to ultimately design a safe and reliable water supply network system.关键词
供水规划/最大日最大时平差/消防校核平差/事故校核平差Key words
Water supply planning/Maximum daily maximum hour adjustment/Fire safety verification adjustment/Dccident verification adjust-ment分类
建筑与水利