考虑气候风险耦合影响的中长期电力资源规划OA北大核心CSTPCD
Medium and long term power resource planning considering the coupled impact of climate risks
考虑气候风险对电力供应和需求的影响进行电力系统气候适应性规划研究十分重要且紧迫.文中从规划视角开展电力系统气候适应性研究,构建考虑气候风险耦合影响的中长期电力资源规划模型,通过电力资源优化配置提升电力系统气候适应水平.结果表明:考虑气候长期变化趋势的规划方案中可再生能源发电量占比在装机容量减少的情况下反而有所增加,可再生能源利用水平提升,系统年均总投资建设成本下降;而考虑极端天气气候风险的规划方案中可控电源年均装机容量和发电量增加,以支撑可再生能…查看全部>>
It is very important and urgent to conduct a study on climate adaptation planning for power systems considering the impacts of climate risks on power supply and demand.In this study,a study was carried out on power system climate adaptation from a planning perspective:a medium and long term power resource planning model that considers the coupled impacts of climate risks was constructed to enhance the level of power system climate adaptation through the opti…查看全部>>
袁家海;牟琪林;张浩楠;赵艺莹;张健
华北电力大学经济与管理学院,北京 102206||新能源电力与低碳发展研究北京市重点实验室,北京 102206华北电力大学经济与管理学院,北京 102206华北电力大学(保定)经济管理系,保定 071003华北电力大学经济与管理学院,北京 102206华北电力大学经济与管理学院,北京 102206
气候风险电源规划气候适应性极端天气电力系统
Climate risksPower resource planningClimate adaptationExtreme weatherPower system
《气候变化研究进展》 2024 (5)
624-635,12
国家自然科学基金面上项目(72173043)教育部人文社会科学研究后期资助项目(22JHQ096)国家自然科学基金青年基金项目(72303064)
评论