| 注册
首页|期刊导航|热力发电|600MW等级超超临界燃煤发电机组动态建模与变负荷控制优化

600MW等级超超临界燃煤发电机组动态建模与变负荷控制优化

刘茜 刘泽锋 王朝阳 刘明 严俊杰

热力发电2024,Vol.53Issue(10):97-105,9.
热力发电2024,Vol.53Issue(10):97-105,9.DOI:10.19666/j.rlfd.202405091

600MW等级超超临界燃煤发电机组动态建模与变负荷控制优化

Dynamic modeling and variable load control optimization for 600 MW class ultra-supercritical coal-fired power generation units

刘茜 1刘泽锋 2王朝阳 2刘明 2严俊杰2

作者信息

  • 1. 西安交通大学动力工程多相流国家重点实验室,陕西 西安 710049||西安热工研究院有限公司,陕西 西安 710054
  • 2. 西安交通大学动力工程多相流国家重点实验室,陕西 西安 710049
  • 折叠

摘要

Abstract

To improve the control effect of key parameters and energy conversion efficiency of ultra-supercritical coal-fired power generation units during load cycling process,600 MW class ultra-supercritical coal-fired power generation units are taken as the research objects to carry out modeling and verification.The deviation of key thermal parameters meets the specified range of thermal power simulation standard.The spatiotemporal distribution model of internal heat storage in thermal system of coal-fired power generation units is established,and the water-fuel ratio and flue gas damper opening control logic of the feedforward internal heat storage state of the unit are proposed.The real-time heat storage state of the unit during the load cycling process is fed forward to the flow rate of feed water,coal,and flue gas damper control.The simulation results show that,when the unit load cycling rate varies from 1.0%Pe/min to 3.0%Pe/min within 40%~70%THA load range,the absolute value of the cumulative main steam temperature deviation rate decreases by 27%~31%.The average power generation standard coal consumption rate of the unit decreases by 0.37~0.65 g/(kW·h)during the transient process.The proposed control strategies improve the control accuracy of key thermal parameters and the energy conversion efficiencies of the ultra-supercritical coal-fired power generation units during load cycling transient processes.

关键词

燃煤发电/变负荷/汽温控制/瞬态节能

Key words

coal-fired power generation/variable load/steam temperature control/transient energy saving

引用本文复制引用

刘茜,刘泽锋,王朝阳,刘明,严俊杰..600MW等级超超临界燃煤发电机组动态建模与变负荷控制优化[J].热力发电,2024,53(10):97-105,9.

基金项目

国家重点研发计划项目(2022YFB4100402) National Key Research and Development Program of China(2022YFB4100402) (2022YFB4100402)