| 注册
首页|期刊导航|港口航道与近海工程|全侧向爆破挤淤技术在深厚软土中快速筑堤技术研究

全侧向爆破挤淤技术在深厚软土中快速筑堤技术研究

胡小波 王海燕

港口航道与近海工程2024,Vol.61Issue(5):110-115,6.
港口航道与近海工程2024,Vol.61Issue(5):110-115,6.DOI:10.16403/j.cnki.ggjs20240520

全侧向爆破挤淤技术在深厚软土中快速筑堤技术研究

Research on Rapid Embankment Construction Process under Condition of Thick Soft Soil Layer by Using Fully Lateral Blasting for Silt Squeezing

胡小波 1王海燕1

作者信息

  • 1. 中交上海三航科学研究院有限公司,上海 200032
  • 折叠

摘要

Abstract

A trial on the embankment construction by using fully lateral blasting for silt-squeezing was carried out firstly in the sea reclamation project of Lianyungang airport industrial park in China,a permanent section of revetment only required the dumping of stones and lateral blasting,which led to high efficiency.In the case,an introduction to the above method was made,including the main technical concepts,the design of blasting parameters,trial construction process,construction quality inspection and evaluation.Based on the detected section,Swedish slice method and finite element method were used to analyze and evaluate the stability and displacement of the section of the completed embankment.The conventional end blasting method was compared with fully lateral blasting for silt squeezing into order to analyze their characteristics.The results showed that fully lateral blasting for silt squeezing was of a higher efficiency and reduced the quantities of filling materials in the construction of embankment and revetment with a sludge treatment depth of less than 15 m and a bottom width of less than 30 m from the center of the embankment.In addition,and the method could also meet the requirements for the stability of the embankment.

关键词

全侧向爆破挤淤/端部爆破/堤身稳定性/施工工效

Key words

fully lateral blasting for silt squeezing/end blasting/embankment stability/construction efficiency

分类

建筑与水利

引用本文复制引用

胡小波,王海燕..全侧向爆破挤淤技术在深厚软土中快速筑堤技术研究[J].港口航道与近海工程,2024,61(5):110-115,6.

港口航道与近海工程

1004-9592

访问量0
|
下载量0
段落导航相关论文