| 注册
首页|期刊导航|港口航道与近海工程|简析大铲湾码头港池的疏浚清淤施工

简析大铲湾码头港池的疏浚清淤施工

柯秋锐 于亚南

港口航道与近海工程2024,Vol.61Issue(5):126-129,4.
港口航道与近海工程2024,Vol.61Issue(5):126-129,4.DOI:10.16403/j.cnki.ggjs20240523

简析大铲湾码头港池的疏浚清淤施工

Desilting and Dredging of Harbor Basin at Dachan Bay Terminal

柯秋锐 1于亚南1

作者信息

  • 1. 中交广航疏浚有限公司,广东广州 510220
  • 折叠

摘要

Abstract

In the dredging of harbor basin and channel,the sediment transport by water flow in the waters around the harbor often causes the phenomenon of siltation during the construction period.The average siltation intensity gradually increases with the increment of dredging depth,which is a greatly challenge to the progress and quality management of projects.Based on the difficulty in backfilling in the dredging and desilting of harbor basin at Dachan Bay Terminal in Shenzhen Port,an in-depth analysis was carried out for the sedimentation law,which led to the optimum construction process of trailing dredger,modified vessel parameters for the dredger and etc.The above measures significantly improved the efficiency of the dredger in similar projects.

关键词

大铲湾/淤积分析/港池/码头前沿/清淤

Key words

Dachan bay/sedimentation analysis/harbor basin/wharf apron/dredging

分类

交通工程

引用本文复制引用

柯秋锐,于亚南..简析大铲湾码头港池的疏浚清淤施工[J].港口航道与近海工程,2024,61(5):126-129,4.

港口航道与近海工程

1004-9592

访问量0
|
下载量0
段落导航相关论文