| 注册
首页|期刊导航|核安全|国内重水堆核电站工程配套全堆芯压力管更换项目核安全监管策略研究

国内重水堆核电站工程配套全堆芯压力管更换项目核安全监管策略研究

杨义平 侯癸合 顾俊骥 李晨航

核安全2024,Vol.23Issue(5):30-36,7.
核安全2024,Vol.23Issue(5):30-36,7.

国内重水堆核电站工程配套全堆芯压力管更换项目核安全监管策略研究

Study on Nuclear Safety Supervision Strategy of Retube Project on CANDU Units of Qinshan Phase III Nuclear Power Plant

杨义平 1侯癸合 1顾俊骥 1李晨航2

作者信息

  • 1. 生态环境部华东核与辐射安全监督站,上海 200233
  • 2. 中原运维海外工程有限公司,上海 200233
  • 折叠

摘要

Abstract

This article introduces the nuclear safety supervision practice of retube project on foreign CANDU units,the key tasks of retube project on domestic CADNU units,as well as the possible problems and difficulties faced in the process of nuclear safety supervision,and puts forward the suggestions as reference for the development of retube project supervision strategy.

关键词

核安全监管/重水堆/压力管更换/监管策略

Key words

nuclear safety supervision/CANDU units/retube/supervision strategy

分类

资源环境

引用本文复制引用

杨义平,侯癸合,顾俊骥,李晨航..国内重水堆核电站工程配套全堆芯压力管更换项目核安全监管策略研究[J].核安全,2024,23(5):30-36,7.

核安全

1672-5360

访问量0
|
下载量0
段落导航相关论文