| 注册
首页|期刊导航|云南水力发电|填充混凝土处治隧道围岩突变实践技术

填充混凝土处治隧道围岩突变实践技术

杨体刚

云南水力发电2024,Vol.40Issue(z2):18-21,31,5.
云南水力发电2024,Vol.40Issue(z2):18-21,31,5.DOI:10.3969/j.issn.1006-3951.2024.Z2.005

填充混凝土处治隧道围岩突变实践技术

Practical Technology of Filling Concrete to Treat Sudden Changes in Tunnel Surrounding Rock

杨体刚1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

The treatment of surrounding rock deformation in tunnels is a key and difficult point in tunnel construction technology management,and it is also the key to whether tunnels can be safely and smoothly connected.With the continuous progress of tunnel construction technology in China,various world-class technical problems in tunnel construction have been overcome.Through the practical application of filling concrete for emergency treatment of surrounding rock mutation on a highway in Yunnan,a systematic summary of construction technology has been carried out.

关键词

高速公路/隧道/变形处治/填充混凝土

Key words

expressway/tunnel/deformation treatment/fill concrete

分类

水利科学

引用本文复制引用

杨体刚..填充混凝土处治隧道围岩突变实践技术[J].云南水力发电,2024,40(z2):18-21,31,5.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文