云南水力发电2024,Vol.40Issue(z2):35-37,3.DOI:10.3969/j.issn.1006-3951.2024.Z2.009
HDPE管接头方式的选择及施工控制要求
Selection of HDPE Pipe Joint Method and Construction Control Requirements
瞿隆钰1
作者信息
- 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
- 折叠
摘要
Abstract
This paper focuses on the Kandy North Water Supply Project in Sri Lanka as the main research object.The total length of HDPE pipes in this project is about 570 km,with diameters of 63 mm,90 mm,110 mm,160 mm,225 mm,and 280 mm respectively.The construction period is 36 months,and the pipes are laid along the existing road edge with an excavation depth of 1m.Based on the design requirements and construction characteristics of this project,the selection of pipe joint connection methods and construction control are particularly important.关键词
HDPE管/接头方式的选择/施工控制/施工特点Key words
HDPE pipe/selection of joint method/construction control/construction characteristic分类
水利科学引用本文复制引用
瞿隆钰..HDPE管接头方式的选择及施工控制要求[J].云南水力发电,2024,40(z2):35-37,3.