高海拔地区集电线路施工技术要点

李霞 王加兴

云南水力发电2024,Vol.40Issue(z2):49-52,4.
云南水力发电2024,Vol.40Issue(z2):49-52,4.DOI:10.3969/j.issn.1006-3951.2024.Z2.013

高海拔地区集电线路施工技术要点

Key Points of Construction Technology for Power Collection Lines in High-altitude Area

李霞 1王加兴1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

There are different changes in the construction and operation of transmission lines in photovoltaic power plants,such as unqualified construction technology,aging and deterioration of insulation materials,and mechanical damage to the outer protective layer caused by external forces.The selection and construction of transmission lines are important technologies for ensuring the normal operation of electrical systems.Therefore,this article analyzes the key points of photovoltaic project collection line construction in high-altitude areas,focusing on the preparation work before construction,material selection and wiring,installation and connection,as well as maintenance and repair.Through reasonable construction measures and quality control,the safe and stable operation of photovoltaic project collection lines in high-altitude areas can be ensured.

关键词

高海拔地区/光伏项目/集电线路/施工要点/质量控制

Key words

high altitude area/photovoltaic project/collection line/key points of construction/quality control