TB水电站主厂房预留岩盖法开挖施工技术

庞佳加 董罗钢 赵智勇 杨庆美

云南水力发电2024,Vol.40Issue(z2):103-107,5.
云南水力发电2024,Vol.40Issue(z2):103-107,5.DOI:10.3969/j.issn.1006-3951.2024.Z2.025

TB水电站主厂房预留岩盖法开挖施工技术

Construction Technology of Reserved Rock Cover Excavation for TB Hydropower Station Main Building

庞佳加 1董罗钢 1赵智勇 1杨庆美1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

Due to the criss crossing and interlocking arrangement of underground engineering caverns,a multi-dimensional,three-dimensional and parallel construction situation is formed in terms of space and time.Combining some advanced and rapid construction methods for large-scale underground engineering construction,TB Hydropower Station has innovatively proposed a"reserved rock cover method"for excavation construction of underground powerhouses.It solves the problem of parallel construction of the upper and lower levels of underground factory buildings,as well as the problem of long construction period occupied by excavation support due to the large excavation height using conventional construction methods,accelerating the construction progress and shortening the construction period.

关键词

TB水电站/地下厂房/开挖支护/预留岩盖/快速施工

Key words

TB Hydropower Station/underground factory building/excavation support/reserved rock cover/rapid construction