| 注册
首页|期刊导航|云南水力发电|空间转弯条件下斜井滑模混凝土施工技术

空间转弯条件下斜井滑模混凝土施工技术

李炳秀 张发斌 孙启佑 杨庆美

云南水力发电2024,Vol.40Issue(z2):108-112,5.
云南水力发电2024,Vol.40Issue(z2):108-112,5.DOI:10.3969/j.issn.1006-3951.2024.Z2.026

空间转弯条件下斜井滑模混凝土施工技术

Construction Technology of Inclined Shaft Sliding Formwork Concrete under Spatial Turning Condition

李炳秀 1张发斌 1孙启佑 1杨庆美1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

In many water conservancy construction projects,inclined shaft construction is quite common,especially in pumped storage projects,which are known for their high difficulty and safety risks,and are the bottleneck and throat of hydropower and water conservancy construction.In recent years,with the continuous development of China's water conservancy and hydropower industry,people's requirements for safety technology in inclined shaft construction have also become increasingly high.The construction technology of inclined shafts often has a significant impact on the progress,quality,safety,and other aspects of the overall engineering project,and even plays a pivotal role.Due to the special nature of the inclined shaft construction environment,it has brought great difficulties to the construction project,and there are also many unsafe factors in inclined shaft construction.The downward bend section of the inclined shaft of TB hydropower station is a spatial turn,which greatly increases the difficulty of inclined shaft sliding formwork construction under this condition.This paper briefly explains the construction technology of inclined shaft sliding formwork concrete under spatial turn conditions.

关键词

空间转弯/斜井施工/滑模混凝土/施工环境/安全

Key words

spatial turning/inclined shaft construction/sliding mode concrete/construction environment/security

分类

建筑与水利

引用本文复制引用

李炳秀,张发斌,孙启佑,杨庆美..空间转弯条件下斜井滑模混凝土施工技术[J].云南水力发电,2024,40(z2):108-112,5.

云南水力发电

1006-3951

访问量0
|
下载量0