| 注册
首页|期刊导航|云南水力发电|立交上跨主线桥满堂支架法现浇箱梁施工技术

立交上跨主线桥满堂支架法现浇箱梁施工技术

高英桂 尹莎莎

云南水力发电2024,Vol.40Issue(10):1-4,4.
云南水力发电2024,Vol.40Issue(10):1-4,4.DOI:10.3969/j.issn.1006-3951.2024.10.001

立交上跨主线桥满堂支架法现浇箱梁施工技术

Construction Technology of Cast-in-situ Box Girder using Full Span Support Method for Overpasses Crossing the Main Line Bridge

高英桂 1尹莎莎1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

The construction of vertical cross cast-in-place box girder support method generally adopts the sequence of top to bottom.The current pre-construction of box girder will pose difficulties for the construction of the upper span box girder support method.Based on the successful case of bridge construction on Qingcheng Interchange,this paper explores the construction method of pouring beams on top of beams.Through the design of bridge deck buckle type full hall support and construction techniques such as support installation,preloading,and dismantling,the deformation coordination and unity of the support are ensured,as well as the safety and construction safety of the lower box girder structure.

关键词

支架/荷载/箱梁/桥上桥

Key words

bracket/load/box girder/bridge on bridge

分类

交通运输

引用本文复制引用

高英桂,尹莎莎..立交上跨主线桥满堂支架法现浇箱梁施工技术[J].云南水力发电,2024,40(10):1-4,4.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文