摘要
Abstract
With the development of China's economy and the improvement of modern scientific and technological productivity,the level of urban construction in China is constantly improving,and the level of repairing underground pipelines is also constantly improving.The repair of pipelines adopts non excavation pipe repair and replacement technology,greatly reducing the interference with urban comprehensive transportation.The construction speed is fast,and it not only has no impact on the environment,but also has no impact or interference on people's normal production,life.Taking Qiaotou sewage treatment pipeline project in Qiaotou Town,Dongguan City as an example,this paper elaborates on the application of CIPP ultraviolet curing full lining repair technology in the field of non excavation repair of drainage pipelines.It mainly includes the principle,process flow,and scope of application of UV cured inner lining technology,summarizes construction operations and significant advantages,and provides strong technical support for the project.关键词
非开挖修复/CIPP紫外光修复/全内衬修复/排水管道Key words
non excavation repair/CIPP ultraviolet light repair/full lining repair/drainage pipeline分类
土木建筑