| 注册
首页|期刊导航|云南水力发电|钻孔灌注桩球状风化体爆破施工

钻孔灌注桩球状风化体爆破施工

曾令军 丁涛

云南水力发电2024,Vol.40Issue(10):22-26,5.
云南水力发电2024,Vol.40Issue(10):22-26,5.DOI:10.3969/j.issn.1006-3951.2024.10.006

钻孔灌注桩球状风化体爆破施工

Blasting Construction of Spherical Weathered Body for Bored Pile

曾令军 1丁涛2

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 2. 中咨工程有限公司,北京 100000
  • 折叠

摘要

Abstract

Lufeng Nuclear Power Plant is located in Jieshi Town,Shanwei City,Guangdong Province.The plant site is situated in a border area between sea and land,with complex geological conditions and the presence of spherical weathered bodies in the geological strata.During the construction process of the foundation pit enclosure structure,the presence of spherical weathered bodies makes it difficult to form drilled piles,often resulting in deviated holes,which seriously restricts the progress of the project.By using pre blasting methods to create cracks in isolated rocks and inclined rock layers,drilling efficiency can be improved and engineering progress can be accelerated.

关键词

核电/钻孔灌注桩/倾斜岩层/孤石/爆破

Key words

nuclear power/drilled pile/tilted rock layers/solitary stone/blast

分类

土木建筑

引用本文复制引用

曾令军,丁涛..钻孔灌注桩球状风化体爆破施工[J].云南水力发电,2024,40(10):22-26,5.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文