云南水力发电2024,Vol.40Issue(10):31-35,5.DOI:10.3969/j.issn.1006-3951.2024.10.008
明挖基坑典型干扰问题处置
Disposal of Typical Interference Problems in Open Excavation Foundation Pits
吴健林 1段任荣 1王耀毅 1史伟伟 1田冬冬1
作者信息
- 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
- 折叠
摘要
Abstract
In the process of engineering project management,conflicts in spatial relationships and constraints that do not meet safety protection conditions are often encountered during the construction progress at the project site.These factors bring resistance and uncertainty to the implementation and progress of the engineering project.Therefore,it is necessary to address or standardize the adverse factors encountered from the aspects of engineering treatment measures and management system implementation.Taking the county road relocation,overhead power supply line relocation,ditch relocation,and the handling of the intersection of construction access roads and county roads encountered during the construction process on the project site as examples,this paper summarizes and forms the results.关键词
交叉干扰/位置关系/迁改/导流Key words
cross interference/positional relationship/relocation and reform/diversion分类
水利科学引用本文复制引用
吴健林,段任荣,王耀毅,史伟伟,田冬冬..明挖基坑典型干扰问题处置[J].云南水力发电,2024,40(10):31-35,5.