临近地铁及110kV电缆通道保护区围护桩施工技术

耿军 罗国昭 王平峰

云南水力发电2024,Vol.40Issue(10):46-50,5.
云南水力发电2024,Vol.40Issue(10):46-50,5.DOI:10.3969/j.issn.1006-3951.2024.10.011

临近地铁及110kV电缆通道保护区围护桩施工技术

Construction Technology for Retaining Piles Near Subway and 110 kV Cable Channel Protection Area

耿军 1罗国昭 1王平峰1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

This paper mainly summarizes the construction technology of retaining piles for adjacent subway sections and 110 kV cable channel protection areas based on an example of a municipal highway project in Hangzhou.In response to the complex surrounding environment,weak foundation bearing capacity,and close proximity to subway tunnels and 110 kV cable protection areas,this paper provides a construction technique for retaining piles near subway and 110 kV cable channel protection areas.It not only solves the construction of retaining piles in complex geological conditions,but also reduces the impact on existing structures and surrounding pipelines during construction,ensuring the economic benefits and safety of the project.

关键词

临近地铁/110 kV电缆通道保护区/地铁监测/位移监测

Key words

near subway/110 kV cable channel protection zone/subway monitoring/displacement monitoring