云南水力发电2024,Vol.40Issue(10):56-61,6.DOI:10.3969/j.issn.1006-3951.2024.10.013
长距离硬岩顶管施工关键技术研究
Research on Key Technologies for Long Distance Hard Rock Top Pipe Construction
李亮 1徐云1
作者信息
- 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
- 折叠
摘要
Abstract
The top pipe method for tunnel construction is increasingly being applied in domestic municipal and water supply projects,with the characteristics of high safety and fast construction speed.With the continuous development and maturity of pipe jacking technology,a large number of ultra large caliber and ultra long distance pipe jacking projects have emerged.Combining with the subsequent optimization project of CYB7~CYB8 hard rock pipe jacking construction in the Hanjiang,Rongjiang,and Lianjiang water systems,this article adopts construction techniques such as circulation flushing and slag carrying,sediment treatment,mud drag reduction,and graded jacking through reasonable selection of jacking machines.It solves the common problems of sedimentation,slag return,and high resistance in long-distance hard rock pipe jacking,achieving smooth pipe jacking and summarizing corresponding construction techniques.关键词
长距离/硬岩/顶管/沉渣处理/断层带Key words
long distance/hard rock/top pipe/sedimentation treatment/fault zone分类
建筑与水利引用本文复制引用
李亮,徐云..长距离硬岩顶管施工关键技术研究[J].云南水力发电,2024,40(10):56-61,6.