| 注册
首页|期刊导航|云南水力发电|长距离硬岩顶管施工关键技术研究

长距离硬岩顶管施工关键技术研究

李亮 徐云

云南水力发电2024,Vol.40Issue(10):56-61,6.
云南水力发电2024,Vol.40Issue(10):56-61,6.DOI:10.3969/j.issn.1006-3951.2024.10.013

长距离硬岩顶管施工关键技术研究

Research on Key Technologies for Long Distance Hard Rock Top Pipe Construction

李亮 1徐云1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

The top pipe method for tunnel construction is increasingly being applied in domestic municipal and water supply projects,with the characteristics of high safety and fast construction speed.With the continuous development and maturity of pipe jacking technology,a large number of ultra large caliber and ultra long distance pipe jacking projects have emerged.Combining with the subsequent optimization project of CYB7~CYB8 hard rock pipe jacking construction in the Hanjiang,Rongjiang,and Lianjiang water systems,this article adopts construction techniques such as circulation flushing and slag carrying,sediment treatment,mud drag reduction,and graded jacking through reasonable selection of jacking machines.It solves the common problems of sedimentation,slag return,and high resistance in long-distance hard rock pipe jacking,achieving smooth pipe jacking and summarizing corresponding construction techniques.

关键词

长距离/硬岩/顶管/沉渣处理/断层带

Key words

long distance/hard rock/top pipe/sedimentation treatment/fault zone

分类

建筑与水利

引用本文复制引用

李亮,徐云..长距离硬岩顶管施工关键技术研究[J].云南水力发电,2024,40(10):56-61,6.

云南水力发电

1006-3951

访问量1
|
下载量0
段落导航相关论文