跨高速预制梁桥顶升技术

冯建浩

云南水力发电2024,Vol.40Issue(10):62-66,5.
云南水力发电2024,Vol.40Issue(10):62-66,5.DOI:10.3969/j.issn.1006-3951.2024.10.014

跨高速预制梁桥顶升技术

Top Lifting Technology for Prefabricated Beam Bridges Crossing Expressway

冯建浩1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

In recent years,with the significant improvement of domestic transportation level,the construction of highways in various regions has developed rapidly in a network like manner.In the process of constructing a new transportation network,the renovation of existing roads is an unavoidable topic.The conventional demolition and reconstruction methods have limitations such as long construction period,high cost,and resource waste.Therefore,adopting the method of lifting and elevating the ground to renovate existing bridges can not only meet functional requirements but also reduce costs and improve efficiency.Based on Foshan Qingyuan Conghua Expressway Project,this paper explores the construction technology of synchronous lifting and elevation of prefabricated beam bridges crossing existing highways.The construction method is studied and analyzed in combination with the actual situation of the project,forming a scheme design and construction experience for lifting prefabricated beam bridges crossing highways,and promoting the development and progress of construction technology.

关键词

跨高速/预制梁桥/桥梁顶升/同步控制

Key words

crossing expressway/prefabricated beam bridge/bridge jacking/synchronous control