云南水力发电2024,Vol.40Issue(10):67-71,5.DOI:10.3969/j.issn.1006-3951.2024.10.015
PCCP管快速安装施工关键技术
Key Technologies for Rapid Installation and Construction of PCCP Pipe
徐云 1胡靖彦 1王卓1
作者信息
- 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
- 折叠
摘要
Abstract
Since the beginning of the 21st century,with the positive feedback of national promotion and market demand,PCCP pipes have been increasingly used in the field of water conservancy construction due to their excellent characteristics such as compression resistance,impermeability,and durability.However,due to various factors such as limited space,unfavorable geology,and harsh weather conditions,the efficiency and installation quality of pipeline construction are limited.This article is based on the construction of PCCP pipelines in the basic farmland area of Section 5 of the Hanjiang Rongjiang Lianjiang water system connection optimization project.By optimizing construction organization,changing support forms,and improving installation processes,the efficiency and quality of PCCP pipeline installation in the basic farmland area are improved,and corresponding construction techniques are summarized.关键词
PCCP管道/不良地质/基本农田区/安装施工Key words
PCCP pipeline/adverse geology/basic farmland area/installation and construction分类
建筑与水利引用本文复制引用
徐云,胡靖彦,王卓..PCCP管快速安装施工关键技术[J].云南水力发电,2024,40(10):67-71,5.