220kV高压线下安全施工技术

王文凯 龙慧梅 马莉

云南水力发电2024,Vol.40Issue(10):125-128,4.
云南水力发电2024,Vol.40Issue(10):125-128,4.DOI:10.3969/j.issn.1006-3951.2024.10.027

220kV高压线下安全施工技术

Safety Construction Technology for 220 kV High Voltage Line Underground

王文凯 1龙慧梅 1马莉1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

There are dense transmission lines in the city.When implementing drilling and grouting piles,three-axis cement mixing piles,it involves operating equipment such as rotary drills,disc drills,and cranes.When overhead high-voltage power lines are located in the construction project area,there may be construction under the high-voltage lines,and certain safety and protective measures need to be taken to ensure the safety of construction under the high-voltage lines.

关键词

220 kV/高压铁塔/深大基坑/技术措施

Key words

220 kV/high voltage iron tower/deep foundation pit/technical measure

分类

建筑与水利

引用本文复制引用

王文凯,龙慧梅,马莉..220kV高压线下安全施工技术[J].云南水力发电,2024,40(10):125-128,4.