桩基础岩溶(土)洞处理施工技术
Construction Technology for Karst(Soil)Cave Treatment of Pile Foundation
王耳东 1张全成1
作者信息
- 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
- 折叠
摘要
Abstract
The construction project of pile foundation engineering is prone to engineering quality accidents due to the development of karst(soil)caves.To ensure the safety,quality,progress,and cost control of pile infrastructure,mature sleeve valve pipe grouting treatment technology is selected in practical work.By analyzing geological survey data,the development area of karst caves can be identified,and the positions and depths of grouting holes and exhaust holes can be reasonably arranged.Suitable grouting parameters and processes can be selected to effectively solve the hazards caused by karst.This method can be used for the treatment of karst cave foundations of a certain scale in karst landform areas.关键词
桩基础/岩溶(土)洞/注浆孔布置/袖阀管注浆/串珠状溶洞Key words
pile foundation/karst(soil)cave/layout of grouting hole/sleeve valve pipe grouting/bead shaped karst cave分类
水利科学引用本文复制引用
王耳东,张全成..桩基础岩溶(土)洞处理施工技术[J].云南水力发电,2024,40(10):144-147,161,5.