| 注册
首页|期刊导航|云南水力发电|浅埋隧洞进洞关键施工技术

浅埋隧洞进洞关键施工技术

张春洪 郭际矗

云南水力发电2024,Vol.40Issue(10):148-152,5.
云南水力发电2024,Vol.40Issue(10):148-152,5.DOI:10.3969/j.issn.1006-3951.2024.10.032

浅埋隧洞进洞关键施工技术

Key Construction Technology for Shallow Buried Tunnel Entry

张春洪 1郭际矗1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

Drilling and blasting tunnels often have shallow burial depth and poor surrounding rock conditions.When encountering abundant groundwater,tunnel collapse,roof collapse,deformation,etc.often occur during tunnel construction,posing high construction safety risks,high treatment costs,and seriously affecting construction progress.The article relies on the subsequent optimization project of connecting the Hanjiang,Rongjiang,and Lianjiang water systems.For the construction of shallow buried tunnels,measures such as replacing cement soil at the top of the tunnel,connecting arches and support piles to form a whole,setting advanced small conduits in the middle of the large pipe shed,and replacing the bottom of the arch frame are taken to achieve safe and rapid entry into the tunnel.By summarizing this technology,key construction techniques for shallow buried tunnel entry construction have been developed.

关键词

浅埋隧洞/进洞施工/开挖支护/安全技术

Key words

shallow buried tunnel/entering tunnel for construction/excavation support/security technology

分类

建筑与水利

引用本文复制引用

张春洪,郭际矗..浅埋隧洞进洞关键施工技术[J].云南水力发电,2024,40(10):148-152,5.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文