Construction Technology for Close Range Underpass of Existing Operational Water Diversion Tunnels in Oujiang Diversion Project Tunnel

杨晓维1

作者信息

  • 1. 温州市水利建设管理中心,浙江 温州 325000
  • 折叠

摘要

Abstract

During the construction process of Oujiang Water Diversion Project,there are challenges such as multiple intersecting buildings,high construction safety risks,and tight construction schedules.In order to complete the tunnel construction on schedule with high quality and quantity,and ensure the safe and stable operation of the Zhaoshandu diversion tunnel,one double shield TBM is used for construction in the project.By formulating a detailed and meticulous construction plan,the tunnel underpass construction was successfully completed,and the Zhaoshandu diversion tunnel operated safely and stably.This article proposes three quality protection measures for excavation quality control,inspection and acceptance,emergency plans,and construction organization from three aspects:pre-crossing preparation,crossing stage,and post crossing control.

关键词

引水隧洞/下穿/TBM/施工技术

Key words

water diversion tunnel/wearing underneath/TBM/construction technology