超硬岩长距离顶管机选型技术研究

陈忠银 戴西远

云南水力发电2024,Vol.40Issue(10):175-180,6.
云南水力发电2024,Vol.40Issue(10):175-180,6.DOI:10.3969/j.issn.1006-3951.2024.10.038

超硬岩长距离顶管机选型技术研究

Research on the Selection Technology of Long-distance Pipe Jacking Machine for Superhard Rock

陈忠银 1戴西远1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

With the rapid development of water conservancy engineering construction in China,underground tunnels in water conservancy engineering are increasingly using pipe jacking construction technology due to their long routes,high rock strength,and other objective factors.Due to the long route and complex geological conditions,the selection of pipe jacking machines is particularly important before construction.Based on the optimization project of Hanjiang,Rongjiang,and Lianjiang water systems connection,this paper designs the cutterhead,main drive,main hydraulic cylinder,and relay room of the pipe jacking machine for long-distance pipe jacking construction in ultra hard rocks,and summarizes the selection techniques.

关键词

超硬岩/长距离/顶管机/选型

Key words

superhard rock/long distance/pipe jacking machine/model selection

分类

建筑与水利