云南水力发电2024,Vol.40Issue(10):220-223,4.DOI:10.3969/j.issn.1006-3951.2024.10.048
新山水库土坝安全评价及除险加固方案分析
Safety Evaluation and Analysis of Reinforcement Plan for the Soil Dam of Xinshan Reservoir
摘要
Abstract
Xinshan Reservoir has serious problems such as insufficient flood resistance capacity of the dam,poor quality of soil filling for the dam body,and widespread dispersed infiltration and leakage,which seriously affect the safe and stable operation of flood control and irrigation water supply in the reservoir.To ensure the safe and benign operation of the reservoir,this paper designs and optimizes a risk mitigation and reinforcement plan that combines dam crest elevation and thickening,dam body filling and grouting,and dam foundation shoulder rock curtain grouting based on the current situation of reservoir hazards and safety evaluation conclusions.The results show that the dam reinforcement design scheme is reasonable,and its flood resistance ability has been effectively improved after rectification.The anti-sliding stability of the dam slope and the seepage stability of the dam body meet the requirements of the specifications,and the problem of danger has been effectively solved.The analysis results can provide reference for the anti-seepage and reinforcement of similar dangerous reservoirs.关键词
均质土坝/坝体渗漏/坝顶加高/帷幕灌浆Key words
homogeneous earth dam/dam leakage/raise the dam crest/curtain grouting分类
建筑与水利引用本文复制引用
邓凌云,王欢..新山水库土坝安全评价及除险加固方案分析[J].云南水力发电,2024,40(10):220-223,4.基金项目
安徽省自然科学基金项目(ZRKT2022-031) (ZRKT2022-031)