岩土工程学报2024,Vol.46Issue(z2):107-113,7.DOI:10.11779/CJGE2024S20011
基于间隙参数法的软土盾构隧道施工不确定性表征
Characterization of uncertainty in shield tunneling excavated in soft soils based on gap parameter
摘要
Abstract
To prevent the risk of displacement induced by shield tunneling,it is necessary to conduct probabilistic analysis.Gap parameter explains the source of ground loss in detail by dividing the ground loss into three parts.Based on it,the uncertainty of many parameters in the shield tunneling process is characterized,which provides an important prerequisite for probability analysis.The main idea is to obtain the statistics of three components of the gap parameter:three-dimensional equivalent gap u*3D,gap due to workmanship ω and physical gap g.The three-dimensional equivalent gap u*3D and the gap due to workmanship ω are relatively complicated,and the statistics of the relevant geological and tunneling parameters are given according to the literatures.The physical gap g is directly related to the grouting effects.The filling rate of grouting is determined by the geological radar data,and the statistics of the physical gap are given.关键词
软土/盾构隧道/间隙参数/地层变形/不确定性Key words
soft soil/shield tunnel/gap parameter/construction deformation/uncertainty分类
建筑与水利引用本文复制引用
杨文钰,郑俊杰,仉文岗,章荣军,梁正斌,陶应建..基于间隙参数法的软土盾构隧道施工不确定性表征[J].岩土工程学报,2024,46(z2):107-113,7.基金项目
国家自然科学基金项目(52078236,52338007,52122806) (52078236,52338007,52122806)
国家资助博士后研究人员计划(GZC20242129) (GZC20242129)
广州地铁集团公司科研委托项目(JT204-10011-23001) (JT204-10011-23001)
中铁八局集团有限公司科研委托项目(H20240979) (H20240979)