原子能科学技术2024,Vol.58Issue(z1):362-368,7.DOI:10.7538/yzk.2024.youxian.0604
华龙一号持续改进与压水堆核电技术展望
Continuous Improvement of HPR1000 and Outlook on PWR Technology
邢继 1徐思敏 1袁媛 1李鸣谦 1徐国飞1
作者信息
- 1. 中国核电工程有限公司,北京 100840
- 折叠
摘要
Abstract
Under the background of the booming new industrial revolution,which is characterized by artificial intelligence(Al)technology,China has determined to develop the civil nuclear energy in a positive,safe and orderly way to achieve the mutual promotion of the"carbon peaking"and"carbon neutrality"goals and the new energy technology development.As a kind of mature and reliable nuclear energy technology,the pressurized water reactor(PWR)technology still has broad development prospects over a long period in the future,despite plenty of problems and challenges faced.The technical features of HPR1000,a self-developed third-generation PWR technology in China is presented in this paper,and its continuous improvements are summarized and the challenges on safety and economy are analyzed.Combining the development status of Al technology with its application practices in the nuclear power energy field,an outlook on the future development of AI technology in the PWR technology field is provided.关键词
华龙一号/压水堆技术/人工智能技术/展望Key words
HPR1000/PWR technology/artificial intelligence technology/outlook分类
能源科技引用本文复制引用
邢继,徐思敏,袁媛,李鸣谦,徐国飞..华龙一号持续改进与压水堆核电技术展望[J].原子能科学技术,2024,58(z1):362-368,7.