| 注册
首页|期刊导航|钻探工程|岩心钻探漏失地层水泥堵漏技术的实例分析与研究

岩心钻探漏失地层水泥堵漏技术的实例分析与研究

隗德祥 高金华 刘维平 孙健越

钻探工程2024,Vol.51Issue(z1):327-331,5.
钻探工程2024,Vol.51Issue(z1):327-331,5.DOI:10.12143/j.ztgc.2024.S1.052

岩心钻探漏失地层水泥堵漏技术的实例分析与研究

Case study and analysis of cement plugging technology for core drilling in lost circulation formation

隗德祥 1高金华 1刘维平 1孙健越1

作者信息

  • 1. 中国地质调查局烟台海岸带地质调查中心,山东 烟台 264000||海陆一体化钻探工程技术创新中心,山东 烟台 264000||自然资源部黄河入海口陆海交互作用野外科学观测研究站,山东 烟台 264000
  • 折叠

摘要

Abstract

In this study,the 1000m core drilling of hole ZK407 in the southern and peripheral gold polymetallic resources investigation and evaluation project in Shandong Zhaoping Belt is taken as an example to analyze the technical difficulties of deep gold deposit drilling in Jiaodong area under the background of fault development.The borehole is located in Qingshan village,Nanshu Town,southern end of Zhaoping fault zone.The gold deposit is mainly altered rock type and quartz vein type located in the fracture zone.In the process of drilling,some accidents occurred,such as groundwater pressure imbalance,hole collapse and block clamping,serious leakage and drilling burning.In order to solve these technical problems,some measures have been taken,such as casing isolation,adjusting mud performance,composite material plugging,top leak drilling and cement plugging.These measures have effectively solved the technical problems,achieved the expected goals,and provided qualified geological drilling and physical core data for the research of deep mineral mineralization theory and resource exploration in this area.The results of this study have important reference value for drilling engineering under similar geological conditions.

关键词

漏失地层/堵漏技术/水泥堵漏

Key words

leakage formation/plugging technology/cement plugging

分类

天文与地球科学

引用本文复制引用

隗德祥,高金华,刘维平,孙健越..岩心钻探漏失地层水泥堵漏技术的实例分析与研究[J].钻探工程,2024,51(z1):327-331,5.

钻探工程

2096-9686

访问量0
|
下载量0
段落导航相关论文