| 注册
首页|期刊导航|煤炭与化工|定向预裂爆破切顶沿空留巷技术实践

定向预裂爆破切顶沿空留巷技术实践

李燕涛

煤炭与化工2024,Vol.47Issue(11):29-32,4.
煤炭与化工2024,Vol.47Issue(11):29-32,4.DOI:10.19286/j.cnki.cci.2024.11.007

定向预裂爆破切顶沿空留巷技术实践

Technical practice of directional pre-splitting blasting roof cutting gob-side entry retaining

李燕涛1

作者信息

  • 1. 冀中能源股份有限公司章村矿,河北 邢台 054108
  • 折叠

摘要

Abstract

In order to reduce the tunneling rate of roadway and recover the coal pillar resources in the section,Zhangcun Mine carried out the research on the technology of directional pre-splitting blasting roof cutting and gob-side entry retaining in the coal roadway of 3113 working face.Combined with the geological production conditions of the working face,the main parameters such as roof cutting angle,height and borehole spacing were determined by theoretical calculation,and the phased surrounding rock control scheme was formulated.The field application shows that after blasting roof cutting,the deformation of roadway is reduced,and the economic benefit is remarkable.

关键词

定向爆破/切顶卸压/沿空留巷/围岩控制

Key words

directional blasting/roof cutting pressure relief/gob-side entry retaining/surrounding rock control

分类

矿业与冶金

引用本文复制引用

李燕涛..定向预裂爆破切顶沿空留巷技术实践[J].煤炭与化工,2024,47(11):29-32,4.

煤炭与化工

2095-5979

访问量0
|
下载量0
段落导航相关论文