特大型复合原水泵房工艺优化设计

杨志峰 李洁

净水技术2024,Vol.43Issue(z2):185-191,283,8.
净水技术2024,Vol.43Issue(z2):185-191,283,8.DOI:10.15890/j.cnki.jsjs.2024.s2.026

特大型复合原水泵房工艺优化设计

Process Optimization Design of Extra-Large Scale Composite Raw Water Pump House

杨志峰 1李洁1

作者信息

  • 1. 上海市政工程设计研究总院<集团>有限公司,上海 200092
  • 折叠

摘要

Abstract

This paper takes the raw water pump house of Hangzhou water intake relocation project as a case,introduces the key points of process design for extra-large scale composite pump house.In order to save investment in civil engineering,the lifting pump room of the reserved sedimentation tank and the raw water booster pump room arejointly built,the scale is 3 million m3/d.The selection of key parameters in the design process,optimization of pump room layout,one-way pressure stabilizing tower for water hammer protection,pump room accident flood prevention,simultaneous prevention of water rise by inertia and sediment deposit in the fore bay,and connection with the future sedimentation tank aremainly focused.With the application of hydraulic transition process analysis,the stability and resilient safety of the systemare enhanced,which can be used as a reference for the design of other water intake projects.Based on the needs of operation and maintenance management,the number of variable frequency pumpsis reasonably optimized to match all operating conditions;maximum energy saving of 13.5%can be achieved.After preliminary analysis of direct operating costs,the cost is about 0.284 yuan/t.

关键词

复合原水泵房/工艺设计/雍水/事故防淹/单向补压塔

Key words

composite raw water pump house/process design/water rise by inertia and blockage/accident flood/prevention one-way pressure stabilizing tower

分类

建筑与水利

引用本文复制引用

杨志峰,李洁..特大型复合原水泵房工艺优化设计[J].净水技术,2024,43(z2):185-191,283,8.

基金项目

上海市科委"科技创新行动计划"(22dz1209103) (22dz1209103)

上海市政工程设计研究总院(集团)有限公司课题(K2020K050) (集团)

净水技术

OACSTPCD

1009-0177

访问量0
|
下载量0
段落导航相关论文