高速铁路(英文)2024,Vol.2Issue(3):164-171,8.DOI:10.1016/j.hspr.2024.07.001
Research on fault time prediction method for high speed rail BTM unit based on multi method interactive validation
Research on fault time prediction method for high speed rail BTM unit based on multi method interactive validation
摘要
关键词
High speed rail BTM unit/Remaining faultless operating time/Machine learning/Multi method interactive verificationKey words
High speed rail BTM unit/Remaining faultless operating time/Machine learning/Multi method interactive verification引用本文复制引用
Limin Fu,Junqiang Gou,Chao Sun,Hanrui Li,Wei Liu..Research on fault time prediction method for high speed rail BTM unit based on multi method interactive validation[J].高速铁路(英文),2024,2(3):164-171,8.基金项目
This research was supported by the Integrated Rail Transit Dispatch Control and Intermodal Transport Service Technology Project(Grant No.2022YFB4300500). (Grant No.2022YFB4300500)