电气技术2024,Vol.25Issue(11):42-47,6.
一种输电线路架空地线带电直流融冰方法
A method of energized DC ice-melting for overhead ground wire of transmission line
高凯 1罗日成 1刘娟 1陈子骐 1王昱彤1
作者信息
- 1. 长沙理工大学电气与信息工程学院,长沙 410114
- 折叠
摘要
Abstract
In order to solve the problem that the overhead ground wire ice-melting needs power outage operation,this paper takes two parallel optical fiber composite overhead ground wires(OPGW)and Al-cladding steel strands as the research objects,and proposes a new method of energized DC ice-melting for overhead ground wires.Firstly,the composition principle of the ice-melting circuit in this method is studied in depth.Then,the simulation model of the ice-melting circuit is established by using ATP-EMTP software,and the ice-melting current and the capacity of the ice-melting power supply are calculated.Finally,the ice-melting process of OPGW and Al-cladding steel strand and the temperature distribution of OPGW after de-icing are simulated and analyzed by COMSOL software.The research show that when the ice-melting power supply is installed in the middle of the ice-melting section,two parallel ground wires can deice at the same time;the influence of DC current in the ice-melting section on the non-ice-melting section is very small and can be ignored.关键词
架空地线/光纤复合架空地线(OPGW)/铝包钢绞线/带电/直流融冰Key words
overhead ground wire/optical fiber composite overhead ground wire(OPGW)/Al-cladding steel strand/energized/DC ice-melting引用本文复制引用
高凯,罗日成,刘娟,陈子骐,王昱彤..一种输电线路架空地线带电直流融冰方法[J].电气技术,2024,25(11):42-47,6.