张大伟 康凯 丁键 庞思奇 孙丽杰

热力发电2024,Vol.53Issue(11):10-20,11.
热力发电2024,Vol.53Issue(11):10-20,11.DOI:10.19666/j.rlfd.202403061

基于需求侧调节潜力模型的多类型电源区间协同规划

Collaborative planning between multiple types of power supply zones based on demand-side regulation potential modeling

张大伟 1康凯 2丁键 3庞思奇 3孙丽杰3

作者信息

  • 1. 国网内蒙古东部电力有限公司,内蒙古 呼和浩特 010010
  • 2. 国网内蒙古东部电力有限公司供电服务监管与支持中心,内蒙古 通辽 028000
  • 3. 国网内蒙古东部电力有限公司通辽供电公司,内蒙古 通辽 028000
  • 折叠

摘要

Abstract

This paper focuses on aggregating decentralized demand-side resources through virtual power plants(VPPs)to enhance the peak load management capability in the construction of new electric power systems.The research centers on the core issue of"load-based"virtual power plants participating in power source planning.It investigates the modeling methods for the adjustable potential of virtual power plants,including electric vehicles,air conditioning loads,and industrial loads.Moreover,the paper delineates the economic and operational technical constraints of virtual power plants in power source planning and constructs a power source planning model that accounts for VPPs.Considering the prediction errors of renewable energy and the characterization errors of the VPPs'response potential,the paper utilizes interval optimization theory to reformulate the model into an interval planning model and completes the deterministic transformation of the model through interval order relations and interval possibility.The rationality of the proposed power source planning method is verified through a case study.The results show that the proposed method can effectively aggregate VPP resources,significantly enhancing the system's peak load management capability.The constructed interval planning model can effectively handle forecast errors,ensuring the reliability of planning.This method provides an economically feasible solution for the transformation of the source-load structure in new electric power systems.It is evident that the aggregation and optimized dispatch of VPPs can significantly enhance the flexibility and reliability of the power system.

关键词

电源规划/虚拟电厂/潜力建模/区间优化

Key words

power source planning/virtual power plant/potential modeling/interval optimization

引用本文复制引用

张大伟,康凯,丁键,庞思奇,孙丽杰..基于需求侧调节潜力模型的多类型电源区间协同规划[J].热力发电,2024,53(11):10-20,11.

基金项目

国网内蒙古东部电力有限公司科技项目(526620230003) Technology Project of State Grid Inner Mongolia East Electric Power Co.,Ltd.(526620230003) (526620230003)