| 注册
首页|期刊导航|热力发电|重型燃气轮机联合循环机组三压再热余热锅炉动态建模及运行规律研究

重型燃气轮机联合循环机组三压再热余热锅炉动态建模及运行规律研究

王一丰 奚新国 袁源 阴海强 苏通 曹殿尧 刘加湗 章文茜 李军 翟春华 黄庆 肖俊峰 牛晨晖 苏新民 焦道顺 潘赫男 王乾远

热力发电2024,Vol.53Issue(11):89-100,12.
热力发电2024,Vol.53Issue(11):89-100,12.DOI:10.19666/j.rlfd.202407179

重型燃气轮机联合循环机组三压再热余热锅炉动态建模及运行规律研究

Dynamic modeling and operating rules of three-pressure reheat waste heat recovery steam generator in heavy-duty gas turbine combined cycle unit

王一丰 1奚新国 2袁源 2阴海强 2苏通 2曹殿尧 2刘加湗 2章文茜 2李军 3翟春华 2黄庆 2肖俊峰 4牛晨晖 5苏新民 5焦道顺 2潘赫男 5王乾远2

作者信息

  • 1. 西安热工研究院有限公司,陕西 西安 710054||西安交通大学能源与动力工程学院,陕西 西安 710049
  • 2. 华能南京燃机发电有限公司,江苏 南京 210034
  • 3. 西安交通大学能源与动力工程学院,陕西 西安 710049
  • 4. 西安热工研究院有限公司,陕西 西安 710054
  • 5. 华能国际电力江苏能源开发有限公司,江苏 南京 210015
  • 折叠

摘要

Abstract

Against the dynamic operation characteristics of three-pressure reheat waste heat recovery steam generator(HRSG)of gas turbine combined cycle(GTCC)unit,the Modelica open-source programming language is used to build the simulation model for the HRSG,and the simulation results are compared with the actual operation data during peak load regulation process of the power plant.Under actual operating conditions,the established model can accurately predict the dynamic response laws of main parameters of the HRSG in the dynamic process of steady-state operation after the load drops from full load to low load,then increases from low load to full load,as well as unit shutdown and boundary parameter disturbance.When the unit load decreases from 320 MW to 280 MW,the power of the steam turbine decreases from 124.0 MW to 111.5 MW.The high pressure main steam flow rate decreases from 70.12 kg/s to 63.62 kg/s,and the high pressure main steam pressure decreases from 8 250 kPa to 7 612 kPa.The flue gas parameters at inlet of the HRSG change in about 300 s with the decrease of the unit load,while the steam parameters of the HRSG need about 600 s to complete dynamic response and reach steady state at low load,indicating there is a certain lag in steam parameters of the HRSG compared to the change of gas turbine exhaust gas parameters over time.In the dynamic process the unit shut down,the power of the steam turbine decreases from 130.4 MW to 5.4 MW,the high pressure main steam temperature of the HRSG decreases from 600.1℃to 224.5℃,and the high pressure main steam flow rate reduces from 76.1 kg/s to 15.3 kg/s.

关键词

联合循环发电厂/余热锅炉/调峰/变负荷/动态建模

Key words

combined cycle unit/heat recovery steam generator/peak regulation/variable load/dynamic modeling

引用本文复制引用

王一丰,奚新国,袁源,阴海强,苏通,曹殿尧,刘加湗,章文茜,李军,翟春华,黄庆,肖俊峰,牛晨晖,苏新民,焦道顺,潘赫男,王乾远..重型燃气轮机联合循环机组三压再热余热锅炉动态建模及运行规律研究[J].热力发电,2024,53(11):89-100,12.

基金项目

中国华能集团有限公司总部科技项目(HNKJ20-H42) Science and Technology Project of China Huaneng Group Co.,Ltd.(HNKJ20-H42) (HNKJ20-H42)

热力发电

OA北大核心CSTPCD

1002-3364

访问量9
|
下载量0
段落导航相关论文