| 注册
首页|期刊导航|四川水力发电|PDCA循环在高速铁路工程建设质量管理中的应用

PDCA循环在高速铁路工程建设质量管理中的应用

刘成林 王会超 陈学军

四川水力发电2024,Vol.43Issue(z2):1-4,4.
四川水力发电2024,Vol.43Issue(z2):1-4,4.

PDCA循环在高速铁路工程建设质量管理中的应用

Application of PDCA Cycle in Quality Management of High-speed Railway Construction

刘成林 1王会超 1陈学军1

作者信息

  • 1. 中国水利水电第五工程局有限公司,四川 成都 610066
  • 折叠

摘要

Abstract

In the construction process of specific engineering projects,quality is the most concerned issue of con-struction,design,supervision and construction units.In view of the characteristics of cantilever casting continu-ous beam,such as large span,high height,dense reinforcement and prestressed reinforcement,and many processes,by referring to the PDCA cycle theory for quality management,combining with the practical experi-ence of previous high-speed railway project site management and the advanced level of similar projects in the same industry,QC group activities are carried out for process control.In the construction process of railway projects,potential quality problems and defects in the construction site can be found in time,and solutions can be made and implemented in a targeted manner.Finally,the goal of project quality management activities can be achieved,so as to ensure the construction quality of high-speed railway projects.

关键词

PDCA循环/质量管理/铁路工程/连续梁

Key words

PDCA cycle/Quality management/Railway engineering/Continuous beam

分类

交通运输

引用本文复制引用

刘成林,王会超,陈学军..PDCA循环在高速铁路工程建设质量管理中的应用[J].四川水力发电,2024,43(z2):1-4,4.

四川水力发电

1001-2184

访问量0
|
下载量0
段落导航相关论文