施工管理信息化系统在高速铁路CFG桩施工中的应用OA
Application of Construction Management Information System in the Construction of High-speed Railway CFG Piles
结合雄商高铁临清东站CFG桩施工管理信息化系统的应用实例,通过引入基桩施工管理信息化系统,对CFG桩施工过程中的桩数、桩位、桩长、桩身垂直度、钻进速度、拔管速度、电流值进行全过程控制、提高施工作业进度、确保桩基施工质量的全过程.
Based on the application of the CFG Pile Construction Management Information System in Linqing East Station of Xiongshang High-speed Railway,this paper introduces the application of the CFG Pile Founda-tion Construction Management Information System,during the construction of CFG pile foundation,the pile number,pile position,pile length,pile vertical,drilling speed,pipe pulling speed,current value are controlled in the whole process,which improves the …查看全部>>
王会超
中国水利水电第五工程局有限公司,四川 成都 610066
交通运输
雄商高铁CFG桩施工管理信息化系统施工工艺
Xiongshang High-speed RailwayCFG pileConstruction management information systemCon-struction technology